NOCTULA - Environmental Consultants was hired for technical and scientific assistance for the resolution of a litigation process involving owners, an hunting area and several wind farms in northern Portugal.

Environmental Due-diligence – wind farms in Rio Grande do Norte (BRAZIL)

ProjectsComments Off on Environmental Due-diligence – wind farms in Rio Grande do Norte (BRAZIL)953

NOCTULA – Environmental Consultants was responsible for the Environmental Due-diligence of the Simplified Environmental Report of the wind farms Cabeço Preto I and IV, located in Serra de Santana – Rio Grande do Norte State (Brazil).

The main purpose of the projects “Wind Farm Cabeço Preto I” and “Wind Farm Cabeço Preto IV” is to produce and sell electricity from the abundant wind resource in Serra de Santana Region – Rio Grande do Norte State, by connecting production to the network of Electric Company of Rio Grande do Norte (COSERN).

The Environmental Due-diligence carried out by NOCTULA – Environmental Consultants shown that the Simplified Environmental Report of the wind farms Cabeço Preto I and IV studied the main environmental aspects and their interrelations with the ecosystems, properly identified impacts expected for the several project phases and proposed plans for environmental monitoring to minimize the impacts.

Related Posts